|
The CPR-1000, or CPR1000, (improved Chinese PWR) is a Generation II+ pressurized water reactor, based on the French 900 MWe three cooling loop design imported in the 1990s, improved to have a net power output of 1,000 MWe (1080 MWe gross) and a 60-year design life. The CPR-1000 is built and operated by the China General Nuclear Power Group (CGNPG), formerly known as China Guangdong Nuclear Power. For the second unit 70% of equipment is produced in China, working toward a 90% future target. This represents the first (principally) Chinese reactor, intended for the international market. If this reactor is built abroad, then China becomes among the six countries to export reactors. == Construction == The CPR-1000 has been quickly deployed in China with fifteen units under construction at the time of June 2010. On 15 July 2010, China’s first CPR-1000 nuclear power plant, Ling Ao-3, was connected to the grid, having started criticality testing on 11 June 2010. It started commercial operations on 27 September 2010, with Ling Ao-4 starting commercial operation on 7 August 2011. Four interim reactors at Daya Bay and Ling Ao Phase 1 are sometimes called CPR-1000s, but these are closely based on the French 900 MWe design (M310〔), with net power output below 1,000 MWe, and using mostly imported components. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「CPR-1000」の詳細全文を読む スポンサード リンク
|