|
ASTRID (Aarhus STorage RIng in Denmark) is a particle storage ring at the Department of Physics and Astronomy of Aarhus University. ASTRID was designed, constructed and is operated by the Institute for Storage Ring Facilities in Aarhus (ISA). ==History== Designs for ASTRID started in 1985.〔 〕 The original concept for the ring was to store low-energy heavy ions for laser spectroscopic and laser cooling experiments and for atomic collision studies.〔 〕 It was soon realised during the design phase that it would also be possible to store energetic electron beams in the ring and therefore ASTRID could operate as a synchrotron radiation (SR) source, providing photons in the UV to soft x-ray region. In 1988 the Natural Sciences Faculty at Aarhus University was awarded 16.7 M DKK for establishing an Instrument centre in Synchrotron Radiation Research, thus forming ISA. By late 1989 ASTRID was operating in ion storage mode with the first experiments being carried out on laser cooling a stored beam of Li+ ions to 1 mK .〔 〕 Electrons were first stored in ASTRID in 1991 and by this time two beamlines had been constructed to make use of the synchrotron light, a surface science beamline (SX700) and an x-ray microscope (XM). Ion storage in ASTRID dominated in the early 90s, with many successful experiments storing both positive and negative ions ranging in mass from 1 (hydrogen atom) to 840 (carbon 70 cluster). Meanwhile the synchrotron radiation based research at ISA was expanding, and by 1995 ASTRID was operated 50% of the time in ion storage mode and 50% for synchrotron radiation. With the construction of the Electrostatic Storage Ring for Ions (ELISA) in 1998, and an increasing demand for synchrotron radiation (by 2000 there were 7 beamlines on ASTRID using the light source), the ion storage runs were gradually reduced, until finally in 2005 ASTRID operated in ion storage mode for the last time. Since then ASTRID has been operating in electron storage mode producing synchrotron radiation throughout the year, with 3 or 4 electron runs, separated by shutdown periods for maintenance and development of the ring. In December 2008, a contract was awarded to design and build ASTRID2, a 46 meter storage ring which will be built adjacent to ASTRID. Rather than having an electron beam which decays over time, ASTRID2 will be continually "topped up" by a feed from ASTRID, allowing nearly constant current.〔 〕 It is expected to be completed by the end of 2011. It will generate synchrotron radiation to provide a tunable beam of light, expected to be of "remarkable" quality, with wavelengths from the ultraviolet through to soft x-rays. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「ASTRID」の詳細全文を読む スポンサード リンク
|