翻訳と辞書
Words near each other
・ BCAS2
・ BCAS3
・ BCAT (disambiguation)
・ BCB
・ BCB 106.6fm
・ BCBC
・ BCBG
・ BCBP
・ BCBS
・ BCBST
・ BCC
・ BCC Lions FC
・ BCC Research
・ BCC-RAPID
・ BCCI
BC Hydro
・ BC hydrogen highway
・ BC Innovation Council
・ BC Jean
・ BC Junior A Lacrosse League
・ BC Juventus
・ BC Kalev/Cramo
・ BC Kalev/Cramo past rosters
・ BC Kamza Basket
・ BC Khimik
・ BC Khimki
・ BC Kolín
・ BC Kosher
・ BC Kraft Mööbel/Kohila
・ BC Krasny Oktyabr


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

BC Hydro : ウィキペディア英語版
BC Hydro

The BC Hydro and Power Authority is a Canadian electric utility in the province of British Columbia, generally known simply as BC Hydro. It is the main electric distributor, serving 1.8 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department〔(Electrical | City of New Westminster ). Newwestcity.ca. Retrieved on 2014-04-12.〕 and the Kootenay region, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy and Mines, and is regulated by the British Columbia Utilities Commission (BCUC). It is mandated to provide "reliable power, at low cost, for generations."
BC Hydro operates 31 hydroelectric facilities and three natural gas-fueled thermal power plants. As of 2014, 95 per cent of the province's electricity was produced by hydroelectric generating stations, which consist mostly of large hydroelectric dams on the Columbia and Peace Rivers. BC Hydro's various facilities generate between 43,000 and 54,000 gigawatt hours of electricity annually, depending on prevailing water levels. BC Hydro's capacity is about 11,000 megawatts.
Electricity is delivered through a network of 18,286 kilometers of transmission lines and 55,254 kilometers of distribution lines. For the 2013-2014 fiscal year, the domestic electric sales volume was 53,018 gigawatt hours, revenue was $5.392 billion and net income was $549 million.
==History==

BC Hydro was created in 1961 when the government of British Columbia, under Premier WAC Bennett, passed the ''BC Hydro Act''. This act led to the amalgamation of BC Electric Company and the BC Power Commission, and the creation of the British Columbia Hydro and Power Authority (BCHPA).
The BC Power Commission was established with the Electric Power Act in 1945 by Premier John Hart. The mandate of the Power Commission was to amalgamate existing power and generating facilities across the province not served by BC Electric, and to extend service to the many smaller communities without power.〔B.C. Hydro. Power Pioneers (1998), ''op. cit.'', p. 73.〕
BC Electric Company began as the British Columbia Electric Railway (streetcar and lighting utility) in Victoria, Vancouver and New Westminster in 1897. Power was generated by coal-fired steam plants. Increasing demand in the Edwardian boom years meant BC Electric sought expansions through Hydro power at Buntzen Lake, and later at Stave Lake. Sensible growth and expansion of the power, streetcar and coal gas utilities meant that BC Electric was a major company in the region.
An English financier named Robert Horne-Payne secured the funding and created the large company from what had been a patchwork of small regional electric railway and steam, hydro and diesel plants.
Also at this time, sawmills and factories converted to electricity, further increasing load. BC Electric erected more local hydro stations around the province. Similarly, small towns also built and operated their own power stations. More power transmission lines were built. Dams and hydro-electric generating stations were built on the Puntledge, Jordan, and Elk rivers in the 1920s.
BC Electric created one of the largest streetcar and interurban systems in the world with some 200 miles of track running from Point Grey to Chilliwack. There were both city street cars and interurban cars servicing Richmond, Burnaby, New Westminster, Vancouver, North Vancouver, and Victoria.

By the First World War, private cars and jitneys were beginning to affect streetcar traffic. The expansion of private automobile ownership in the 1920s further constrained the expansion of streetcar lines. New dams were planned, including the diversion from the Bridge River to Seton Lake, near Lillooet, but the economic depression of the 1930s restricted business expansion. Also with the depression came an increase in the ridership, and a decrease in the maintenance of the streetcar system.
In 1947 the BC Power Commission completed John Hart Generating Station at Campbell River. In the early 1950s the ageing streetcars and interurban trains were replaced by electric trolley buses, and diesel buses. BC Electric finally completed the Bridge River Generating Station in 1960. BC Electric and later BC Hydro continued to operate the transit system by funding it with a small levy on the electric bill, until the transit system was taken over by BC Transit in 1980.
In 1958 BC Electric began construction of the Burrard Generating Station near Port Moody. It opened in 1961 and, although it is now fueled only by natural gas, and operated only intermittently when needed, it continues to generate controversy due to its proximity to Vancouver and its associated greenhouse gas emissions. In 2001 it represented over 9% of BC Hydro's gross metered generation.〔(System Unavailable ). Bchydro.com (2012-11-30). Retrieved on 2014-04-12.〕
On August 1, 1961, just days after company president Dal Grauer died, the BC government passed the legislation which changed BC Electric from a private company to a crown corporation known as BC Hydro. In 1988 BC Hydro sold its Gas Division which distributed natural gas in the lower mainland and Victoria to Inland Natural Gas. Inland was acquired by Terasen Gas in 1993.