翻訳と辞書
Words near each other
・ Crawl frog
・ Crawl Island, Bermuda
・ Crawl Key
・ Crawl ratio
・ Crawl Space (album)
・ Crawl Space (Bob's Burgers)
・ Crawl Space (Breaking Bad)
・ Crawl space vent
・ Crawl to China
・ Crawl To Me
・ Crawler
・ Crawler (band)
・ Crawler (BEAM)
・ Crawler excavator
・ Crawler-transporter
Crawlerway
・ Crawley
・ Crawley (disambiguation)
・ Crawley (surname)
・ Crawley (UK Parliament constituency)
・ Crawley and District Football League
・ Crawley and Horsham Hunt
・ Crawley Baths
・ Crawley Borough Council election, 1998
・ Crawley Borough Council election, 1999
・ Crawley Borough Council election, 2000
・ Crawley Borough Council election, 2002
・ Crawley Borough Council election, 2003
・ Crawley Borough Council election, 2010
・ Crawley Borough Council election, 2011


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Crawlerway : ウィキペディア英語版
Crawlerway

The Crawlerway is a wide〔(【引用サイトリンク】url=http://www-pao.ksc.nasa.gov/nasafact/count3teaf.htm )〕 double pathway at the Kennedy Space Center in Florida. It runs between the Vehicle Assembly Building and the two launch pads at Launch Complex 39. It has a length of to Pad 39A and to Pad 39B. A seven-foot (2 m) bed of stones lies beneath a layer of asphalt and a surface made of Tennessee river rocks.
The Crawlerway was designed to support the weight of a Saturn V rocket and payload, plus its Launch Umbilical Tower and Mobile Launch Platform, atop a Crawler-transporter during the Apollo Program. It was used from 1981–2011 to transport the lighter Space Shuttles to their launch pads.
Construction of the Crawlerway connected Merritt Island with the mainland, forming a peninsula. The main vehicle access road to and from the launch pads, the Saturn Causeway, runs alongside the crawlerway.
==Construction==
The crawlerway is composed of two wide lanes, separated by a median. The top layer is of Alabama river gravel 4in thick on the straight sections and 8in thick on curves. Alabama river gavel was chosen due to its anti spark properties Beneath that is 4 ft of graded, crushed stone, resting on two layers of fill.〔 As of 2013 a project to repair and upgrade the crawlerway is in process, the first time since it was constructed that the foundation will be repaired. Additional rock has been added to the surface on June 2014.〔(【引用サイトリンク】url=http://www.nasa.gov/exploration/systems/ground/crawlerway_upgrades.html )
nasa tour guide

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Crawlerway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.