翻訳と辞書
Words near each other
・ Luisium
・ Luislândia
・ Luisma
・ Luisma (Spanish footballer)
・ Luismi
・ Luismi (footballer, born 1979)
・ Luismi (footballer, born 1983)
・ Luismi (footballer, born 1992)
・ Luison
・ LUISS School of Government
・ Luiste
・ Luiswishi Mine
・ Luisão
・ Luit
・ Luit Bieringa
Luita
・ Luite
・ Luite Klaver
・ Luitemaa Nature Reserve
・ Luitfriedia
・ Luitgard
・ Luitgard Im
・ Luitgarde of Vermandois
・ Luitingh-Sijthoff
・ Luitok Bhetibo Kune
・ Luitpold
・ Luitpold Adam
・ Luitpold Braun
・ Luitpold Coast
・ Luitpold Gymnasium


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Luita : ウィキペディア英語版
Luita

The Luita plant will be the largest copper and cobalt processing plant in Africa, and the largest cobalt facility in the world. It is being built in modules by the Central African Mining and Exploration Company (CAMEC) in Katanga Province, Democratic Republic of the Congo.
The Luita plant is designed to process copper and cobalt concentrate from Mukondo Mountain, which may be the richest cobalt reserve in the world. In July 2008 CAMEC said the resource estimate at Mukondo was 70 million tons of ore containing 1.5 million tons of copper and 500,000 tonnes of cobalt. The cobalt grade averages 1.2%, an exceptionally high concentration.
The ore is concentrated at the Dense Media Separation (DMS) plant at Kakanda before being trucked to Luita.〔
In February 2008 CAMEC and their partner, Dan Gertler's Prairie International, announced that the Mukondo Mountain operations had restarted.〔
In July 2008 CAMEC said the Luita facility, due to be completed later that year, would be the largest of its kind in the world.
The target was to produce 100,000 tonnes per year of copper cathode.
By the end of March, 2008, CAMEC had invested $200 million in Luita, and had three SX/EW copper cathode trains in operation, and a small cobalt concentrator. Eventually there were plans for nine copper cathode trains and one cobalt train, each wide and in length. The under-roof plant will be in size.〔
When running at full production, the plant was planned to produce 12,000 tons per year of cobalt cathode at 99.9% purity, about one third of total global production of cobalt in 2008.〔
However, in July 2009 CAMEC announced a long term agreement under which CAMEC would deliver its entire annual production of cobalt in concentrate from Mukondo Mountain to Zhejiang Galico Cobalt & Nickel Materials of China. At that time production was running at between 6,000 and 8,000 tons per year of cobalt in concentrate.
==References==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Luita」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.