翻訳と辞書
Words near each other
・ STS-29
・ STS-3
・ STS-30
・ STS-31
・ STS-32
・ STS-33
・ STS-34
・ STS-35
・ STS-36
・ STS-37
・ STS-38
・ STS-39
・ STS-3xx
・ STS-4
・ STS-40
STS-400
・ STS-41
・ STS-41 (disambiguation)
・ STS-41-B
・ STS-41-C
・ STS-41-D
・ STS-41-G
・ STS-42
・ STS-43
・ STS-44
・ STS-45
・ STS-46
・ STS-47
・ STS-48
・ STS-49


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

STS-400 : ウィキペディア英語版
STS-400

STS-400 was the Space Shuttle contingency support (Launch On Need) flight that would have been launched using if a major problem occurred on during STS-125, the final Hubble Space Telescope servicing mission (HST SM-4).
Due to the much lower orbital inclination of the HST compared to the ISS, the shuttle crew would have been unable to use the International Space Station as a "safe haven," and NASA would not have been able to follow the usual plan of recovering the crew with another shuttle at a later date.〔 Instead, NASA developed a plan to conduct a shuttle-to-shuttle rescue mission, similar to proposed rescue missions for pre-ISS flights.〔 The rescue mission would have been launched only three days after call-up and as early as seven days after the launch of STS-125, since the crew of ''Atlantis'' would only have about three weeks of consumables after launch.〔
The mission was first rolled out in September 2008 to Launch Complex 39B two weeks after the STS-125 shuttle was rolled out to Launch Complex 39A, creating a rare scenario in which two shuttles were on launch pads at the same time.〔 In October 2008, however, STS-125 was delayed and rolled back to the VAB.
Initially, STS-125 was retargeted for no earlier than February 2009. This changed the STS-400 vehicle from ''Endeavour'' to ''Discovery''. The mission was redesignated STS-401 due to the swap from ''Endeavour'' to ''Discovery''. STS-125 was then delayed further, allowing ''Discovery'' mission STS-119 to fly beforehand. This resulted in the rescue mission reverting to ''Endeavour'', and the STS-400 designation being reinstated.〔 In January, 2009, it was announced that NASA was evaluating conducting both launches from Complex 39A in order to avoid further delays to Ares I-X, which, at the time, was scheduled for launch from LC-39B in the September 2009 timeframe.〔 It was planned that after the STS-125 mission in October 2008, Launch Complex 39B would undergo the conversion for use in Project Constellation for the Ares I-X rocket.〔 Several of the members on the NASA mission management team said at the time (2009) that single-pad operations were possible, but the decision was made to use both pads.〔〔
== Crew ==
The crew assigned to this mission was a subset of the STS-126 crew:〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「STS-400」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.