|
"WIN350" was the name given to the 6-car experimental high-speed ''Shinkansen'' train developed in 1992 by the West Japan Railway Company (JR West) in Japan to test technology to be incorporated in next-generation shinkansen trains expected to operate at speeds of from 1994. Initially given the designation "500X", the name "WIN350" stood for "West Japan's Innovation for operation at 350 km/h". ==Design== Cars 500-901 to 500-903 were built by Kawasaki Heavy Industries in Hyogo Prefecture. Cars 500-904 to 500-906 were built by Hitachi in Yamaguchi Prefecture. The front-end designs of the two driving vehicles (500-901 and 500-906) were slightly different, with 500-906 featuring a "cockpit" style arrangement.〔 The external livery was purple and light grey, with darker purple lining. All axles were motored, using 300 kW three-phase motors, and cars were equipped with tilting and active suspension.〔 Internally, only car 4 was fitted with passenger seats, with 10 rows of 3+2 standard-class seating and 5 rows of 2+2 Green class (first class) seating.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「WIN350」の詳細全文を読む スポンサード リンク
|